British Bakels Site Expansion

Image
Image

British Bakels Site Expansion

British Bakels

The Opportunity

  • Treble the production space of the factory, to enable Bakels to capitalise on their growing business for the foreseen market opportunities.
  • Maximise the land usage of the site and use development capital efficiently. Apply the Austin integrated design, management and construction method to maximise benefits whilst containing cost within a target figure.
  • Construct a new larger factory for the migration of existing production equipment, thus enabling the existing wet production area to be upgraded in future for other production.
  • Replace existing QC laboratory with expanded capacity and improved facilities.
  • Double the size of the covered loading bay, tank bund, tanker loading bay and include an IBC washing facility to improve lorry access and circulation on the site.

Treble the staff canteen and changing rooms. Incorporate additional hygiene facilities to meet customer upgrade expectation.

The Solution

The Austin Company studied the feasibility of three alternative solutions to expand the capacity of the existing factory. Expanding on three sides of the existing factory and extending the plant and service rooms over the existing plant and production areas.
Complicated construction programming allowed Bakels to retain plant and production areas in operation until sufficient parts of new areas could be released or plant re-positioned in prepared, but partly completed, areas.
Managed constructive co-operation between client, Austin and subcontractors, created a positive attitude on the site, resulting in early identification of possible problems and solutions. This project succeeded in meeting the client’s imperatives for capacity, continuity, quality and cost.